In the course of this phase of your installation any potential issues with drainage will likely be addressed. If this is simply not previously existing in the pure lay with the land, a fall or slope might be designed, to stimulate the water to run-off. At A M DRIVEWAYS (N/W) https://localdrivewaycompany.co.uk/block-paving-workington/