Lay the base. increase no more than six inches (15.2 cm) at any given time to the entire excavated spot, and afterwards compact by using a hand tamper (for extremely modest projects) or maybe a mechanical plate https://nellzjju634085.theideasblog.com/28590144/the-2-minute-rule-for-river-gravel-installation-and-maintenance